Fed Ex Parking Garage

Approximately 1700,  12" piles, 75 tons Leimet spliced piles driven in a previous construction dump site. Pilot holes were spudded to clear path for production piles.  Job site location:  Saint Petersburg, Florida
Approximately 1700, 12″ piles, 75 tons Leimet spliced piles driven in a previous construction dump site.
Pilot holes were spudded to clear path for production piles.
Job site location: Saint Petersburg, Florida

Quality from Conception to Installation

  • Basic component materials are readily available
  • Installed price is highly competitive with steel H-Pile and CIP alternatives.
  • Ground water and weather effects on the construction progress are minimized.
  • Can be driven in any sequence without damage to surrounding poles.
  • High bearing capacity equals fewer piles and smaller caps.
  • High lateral strength with resistance to eccentric loads.
  • Higher tensile stress resistance during pile driving.
  • Piles are less likely to be damaged during handling.
  • Precast prestressed concrete pilings are designed and installed with high capacities to promote significant savings.
  • Manufacturing and construction can run concurrently resulting in a substantial reduction of construction time.
  • There are¬†manufacturing and inspection methods in place to guarantee the quality of each piling.