Recent Projects

 NASA Central Campus Headquarters

Project Location:                    Kennedy Space Center

General Contractor:             Hensel Phelps Construction

Job Description:                     428 95′ 18″ Piles

 

Space X Pad 39

General Contractor:           WJ Construction Company

Job Description:                     240 12″ Piles

 

Harris Corporate Headquarters HTC

Project Location:                     Palm Bay, FL

General Contractor:              Balfour Beatty

Job Description:                      Piles- 942 pieces12” x 50’ to 69’ driven to 112 ton allowable capacity completed in 26 working days.

 

 University of Tampa Palms Student Living Facility

Project Location:                   Tampa, FL

Job description:                      542 pieces 12″ Piles

General Contractor:             Crossroads Construction

 

Pelicans Cove Parking Deck

Project location:                   Clearwater Beach, FL

Job Description:                  340 Pieces 14″ Piles

General Contractor:          J. Kokolakis Contracting

 

Tampa International Airport, Federal Aviation Administration

Project Location:                    Tampa, Florida

General Contractor:           J. Kokolakis

Job Description:                      Piles 14’

 

Welcome Center

Project Location:                    Port Canaveral, FL

General Contractor:             Skanska

Job Description:                     Piles 12”

 

CT6 Terminal:

Project Location:                    Port Canaveral, FL

General Contractor:             Skanska

Job Description:                     Piles 12” – 712 Piles

           

Moffitt Cancer:

Project Location:                    Tampa, FL

General Contractor:             Skanska

Job Description:                     Piles 12”

 

CT8 Parking Garage:

Project Location:                    Port Canaveral, FL

General Contractor:             Hardin Construction

Job Description:                     315 Piles 12” x 95’ driven to 125 tons

 

CT1 Terminal

Project Location:                    Port Canaveral, FL

General Contractor:             Ivey’s Construction

Job Description:                     Piles 412 pieces 12”x 95’

 

CTI Parking                           396 Piles 12”x 95’

Quality from Conception to Installation

  • Basic component materials are readily available
  • Installed price is highly competitive with steel H-Pile and CIP alternatives.
  • Ground water and weather effects on the construction progress are minimized.
  • Can be driven in any sequence without damage to surrounding poles.
  • High bearing capacity equals fewer piles and smaller caps.
  • High lateral strength with resistance to eccentric loads.
  • Higher tensile stress resistance during pile driving.
  • Piles are less likely to be damaged during handling.
  • Precast prestressed concrete pilings are designed and installed with high capacities to promote significant savings.
  • Manufacturing and construction can run concurrently resulting in a substantial reduction of construction time.
  • There are manufacturing and inspection methods in place to guarantee the quality of each piling.